Standard Unit of Work

Standard Units of Work are used by the scheduler to create scheduled Work Orders, and are also used by the Repair Guides when used with Breakdowns. All aspects of a job can be encapsulated into a Standard Unit of Work. Each standard unit has:

A series of steps. Each step contains:

  • Step instructions
  • Photographs
  • Attachments (photographs, PDFs, videos, audio, spreadsheets, Word documents, etc.)
  • PPE requirements (ISO 7010 compliant signage)
  • Hazards (ISO 7010 compliant)
  • Required parts list

Resources & Equipment

  • The posts required to undertake the work order, and the amount of time required by each post
  • The tools required to perform the work